返回首页

德州通风管道知名加工厂

本站导航

新闻动态

当前位置:网站首页 > 新闻动态 > 详细信息
钢格栅板制作方法
添加时间:2018/12/11 15:15:29     浏览次数:
1.压焊钢格栅板是由负荷扁钢和横杆按一定间距经炜排列,采用200吨液压电阻焊自动化设备焊接成原板,经切割,开孔,包边等工序加工而成客户要求的产品。
1. Pressure welded steel grille plate is a product required by customers through cutting, opening and edge-wrapping processes. The load flat steel and cross bar are arranged in a Kang at a certain distance, and the original plate is welded by 200 tons of hydraulic resistance welding automation equipment.
2.受荷扁钢间距:两相邻受荷扁钢的中心距,常用30MM,40MM两种。
2. Loaded flat steel spacing: the center distance between two adjacent loaded flat steel, commonly used in 30MM, 40MM two kinds.
3.横杆间距:两相邻横杆的中心间距通常为50MM,100,两种,可按客户要求生产。
3. Cross bar spacing: The center spacing between two adjacent cross bars is usually 50MM, 100, two kinds, which can be produced according to customer requirements.
4.可根据客户要求订制各种型号钢格板。
4. Various types of steel grilles can be customized according to customer requirements.
上一页  压锁钢格栅板运输过程中应注意事项  
下一页  钢格栅板分类
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3